top of page
COMMERCIAL HYDRID SYSTEM FOR
SELF-CONSUMPTION AND BACKUP
45kW Solar PV system with 37kWh Battery Energy Storage System (BESS) and EV Charger
Upgreen team designed, managed, and installed a non-parallel generation system to assure zero export to the grid with a Multi-unit XW+ configuration in 3-phase 120/208V.
The technologies used in our Optimized solution included:
-
Solar PV modules Canadian Solar, bifacial
-
TerraGen racking system for flat roof
-
Multi units of XW+ 6848 Schneider Hybrid Inverters
-
MPPT 100 Charge Controllers
-
Discover AES 48V batteries
-
ASCO Automatic Transfer Switch, Series 300 ATS
-
Charge Point EV Charger
Read the entire case study published by Schneider here
bottom of page