Making the switch to solar energy is an exciting step toward reducing your carbon footprint and saving on energy costs. If you’ve never been through the process before, you might wonder what to expect during a solar panel installation. This guide walks you through each stage, so you’ll know exactly what’s involved from start to finish.
Step 1: Initial Consultation and Site Assessment
We start with a chat about your energy goals and budget, followed by a site visit to check your roof and energy needs. During this assessment, our solar experts will examine:
The size, angle, and condition of your roof
Shading from nearby trees or buildings
Your current energy consumption and needs
Potential increase in energy consumption, preferences and goals
This information helps create a tailored solar energy system designed specifically for your home.
Step 2: System Design and Proposal
Next, we design your custom solar system and provide a detailed proposal with layout, savings estimates, and costs. You’ll receive a detailed proposal that includes:
A visual representation of your system layout
Estimated energy savings over time
A breakdown of costs, including available incentives and rebates
System options that provide different value and cost according to your needs.
This stage allows you to review and approve the design before moving forward.
Step 3: Permits and Approvals
We handle all the paperwork, including a structural analysis of your roof (mandatory in Ontario) and necessary permits with the Local Distribution Company.
Step 4: Installation Day
Our team installs the racking, panels, inverter, and wiring. This usually takes 1-3 days. The installation process usually involves:
Mounting the racking system onto your roof
Attaching the solar panels securely to the racking
Installing the inverter, which converts solar energy into usable electricity
Wiring the system to connect it to your home’s electrical panel
Most residential solar installations take one to three days, depending on the size and complexity of the system. However, if your system involves a battery system, the installation can take up to 2 more days.
Step 5: Inspection and Activation
After the installation is complete, a final inspection is conducted to ensure everything meets safety and performance standards. The electrical authority usually communicates with the Utility Company to authorize the change of meter and start generating. Once the system is approved, the installer can turn it on for commissioning.
Step 6: Monitoring and Maintenance
Once up and running, Upgreen will onboard your system for quarterly performance analysis. You can also monitor energy production in real time. Modern solar systems come equipped with monitoring tools that allow you to track not only your energy production in real time, but also your energy consumption. This information is very helpful to compare your export energy with the credits received from the Utility Company
Conclusion
Solar installation is straightforward and rewarding. Ready to go solar? Contact UpGreen today to begin your journey toward a sustainable future.